Off-grid · Programme delivery
Kerala ANERT Off-Grid Programme
Installed capacity1 kW off-grid × 10 units (10 kW aggregate)
ProgrammeKerala ANERT project
ArchitectureOff-grid solar power plants
SegmentResidential / programme
Indicative annual generation14,104 units
Indicative annual savings₹1.13 lakh
Indicative investment₹5.60 lakh
Indicative payback5.0 years
25-year projected savings₹25.39 lakh
Indicative CO₂ avoided / year11.6 tonnes
Note: Performance figures are indicative, computed from published installed capacity using the same AGSunWin opportunity-calculator assumptions (~4.2 kWh/kW/day, 0.92 performance ratio, ₹8/kWh). They are decision-support estimates — not audited meter readings or a commercial guarantee.
Programme-style off-grid delivery that informs AGSunWin's approach to remote or weak-grid sites — storage-aware sizing and repeatable unit deployment.
Generation figures are indicative AC-equivalent estimates; off-grid usable energy also depends on battery and load discipline.