Commercial buildings
Reduce operating expenditure and improve energy-cost predictability.
AGSunWin Energy · Tamil Nadu
Feasibility, engineering, procurement, installation, approvals and O&M — structured for enterprise decision-making across the state.
The household top-up (up to ₹1,00,000 combined, capped from 3 kW) is not for offices and factories. The state has spoken of 1 lakh homes by March 2027 — that is the government’s target. If the connection is domestic, use the Tamil Nadu state rooftop subsidy brief. If it is a plant, stay on this page.
A dairy, cold store, mill, or nursery with a power bill can be surveyed now. Panels over a continuing crop are not an open scheme. Farm solar and agrivoltaics.
For multi-site portfolios, reporting and implementation templates can be standardised to improve rollout speed and operational consistency.
Sanctioned load profile, billing snapshots and implementation window help us open an engineering discussion quickly.
Book site assessment View case studiesReduce operating expenditure and improve energy-cost predictability.
Large-capacity EPC, engineering studies, demand optimisation and sustainability objectives.
Campuses and facilities needing professionally managed long-horizon solar infrastructure.
One partner. Complete responsibility.
Bill and load-profile analysis for leadership-ready ROI framing.
Roof / land measurement, shadow analysis and feasibility.
System sizing, structural, electrical and financial design.
Procurement, installation, integration and testing.
DISCOM documentation, approvals and net metering.
Monitoring, maintenance and performance optimisation.
Published from company presentation records. Pipeline items are awaiting approvals — not claimed as commissioned capacity.
1 kW off-grid × 10 units — regional residential delivery experience adjacent to Tamil Nadu operations.
View case studyOn-grid industrial / commercial scale project currently awaiting approvals.
View pipeline brief100 kW on-grid solar plant awaiting approvals.
See projects listDesign for 1 MW grid-connected plant and erection support — engineering capability reference (not a Tamil Nadu install claim).
See projects list