AGSunWin Energy · farms and processors
Agrivoltaics in Tamil Nadu: size the plant that serves a bill. The crop-under-panel scheme is not open.
The ministry has called agrivoltaics the next step after PM-KUSUM. There is no application, no extra subsidy rate, and no empanelled-vendor list. If a dairy, cold store, mill, nursery, or packhouse already pays for power, AGSunWin can survey that load now.
People are sharing a Chittoor story and an MNRE poster for the 7th AgriVoltaics World Conference (21–23 October 2026, New Delhi). Those are a case study and a conference. They are not a Tamil Nadu tender. AGSunWin does not attach another project’s acre income to our work, and we do not publish a rupee price on this page. Price follows the site visit.
| What you have | What we can do now | What we will not say |
|---|---|---|
| A farm business with an electricity bill: cold store, dairy, poultry, nursery, mill, packhouse, or shed | Survey, design, and install a plant sized to that bill. A raised canopy is an option when shade helps the business. | That the household rooftop top-up applies. It does not. |
| Cultivated land where crops should continue under panels, and you hope to sell power to the DISCOM | Record the site: acres, crop, who holds the land, distance to the substation. We wait for the notified rules. | That PM-KUSUM 2.0 is open, or that a grant is confirmed. |
| A Tamil Nadu home | Use the home subsidy brief. | That a field plant gets the home slabs. |
One-minute fit check
Nothing is stored until you open the assessment.
Copy for your team
Answer the four points. The summary appears here. Eligibility for any future scheme is not confirmed.
What the government has said
- On 10 March 2026 the minister said PM-KUSUM 2.0 was being prepared with a dedicated agri-PV piece, so panels and crops can share land. PIB.
- On 9 September 2026 he said the next phase was still in process, aimed at small farmers, FPOs, cooperatives, and panchayats, with land ownership staying with the farmer. PIB.
- On 19 October 2026 the MNRE secretary told reporters the ministry is working with Finance on support, inside a revised scheme or as its own scheme, because raised structures cost more. He said it goes to Cabinet when it is ready. Vegetables, horticulture, and floriculture are the early IARI indications. Rice, wheat, and sugarcane are the weaker first fit. Those crop notes are preliminary.
- The old PM-KUSUM window for new plants is closed. Tamil Nadu’s installed Component A capacity, in the Lok Sabha annexure to 31 July 2026, is 3 MW. A landowner starting today is waiting for the next notification.
What we will not promise
- A rupee grant, a feed-in tariff, or a payback year.
- That AGSunWin is empanelled for a scheme that has no vendor list.
- That cultivation continues unchanged under a dense array. If India adopts a rule that most of the land must stay farmed, a packed layout may not qualify. We design to the rule that exists on the day you pay.
- Chittoor’s income figures, or any other project’s yield, as our result.
- The home subsidy of ₹35,000, ₹70,000, or ₹1,00,000 on a field, shop, or factory.
The work you hire us for
Read the bill first
One electricity bill starts the file. Twelve months sizes the plant better. We say whether the roof, the yard, or a raised shed canopy is the structure.
Keep farming and power apart
We engineer the electrical plant. A crop plan needs an agriculture partner. We do not publish a yield.
Hold the future scheme file
If you only have land and a crop, we record acres, ownership, the substation distance, and who will farm. We call you when a notified text exists. We do not file a grant that is not open.
தமிழ்
விவசாய நிலத்திலும் மின் உற்பத்தியிலும் ஒரே இடத்தில் சூரிய மின்சாரம் — இதை அரசு அடுத்த கட்டமாகச் சொல்கிறது. விண்ணப்பம் இன்னும் திறக்கவில்லை. தனி மானியத் தொகை இல்லை. பால் பண்ணை, குளிர்பதனக் கிடங்கு, ஆலை, நாற்றங்கால் போன்ற வணிகத்திற்கு மின் கட்டணம் இருந்தால், அந்த கட்டணத்துக்கு AGSunWin அளவைப் பார்க்கும். வீட்டு கூரை மானியம் இதற்குப் பொருந்தாது. விலை, இடப் பார்வைக்குப் பிறகு.
Sources: PIB, 10 March 2026 and 9 September 2026; MNRE secretary’s remarks reported 19 October 2026; Lok Sabha PM-KUSUM annexure to 31 July 2026; AgriVoltaics World Conference programme, 21–23 October 2026. Schemes change. We re-check before a proposal. Updated 21 October 2026. Questions we answer on a call. How we read this week.